In preparation for the construction of the new Sewage Treatment Works at Bellozanne, it was necessary to enlarge the site to provide adequate space for a new works before the old works could be decommissioned.
The Department for Infrastructure awarded Brenwal the design and build contract to excavate some 60,000m3 of rock from the valley sides of the site, to stabilise the slopes and prepare the site for the future development.
The project included the following key elements.
This £5m project was completed during 2017 on time and to budget.